Mounting and power
Check fasteners and shelf, free screen travel, and cable protection against pinching and tension. Power and grounding follow the manual and project; electrical work is performed by a qualified specialist.
ADTS adapts series hardware, enclosure design and system software to agreed network requirements.
Board, interfaces, peripherals, memory and operating conditions.
Preinstallation, startup, updating and recovery to project requirements.
Access, network interactions, certificates and interface restrictions are checked for the selected platform.
We agree the model, hardware revision, software version, security requirements and pilot criteria. Changes during the transition to series production are agreed with the customer.
Discuss adaptationSchedules, multi-zone content and signage network management depend on the chosen CMS. We agree on your platform, media player connections and content updates, and validate compatibility in a pilot.
Agree requirements before the pilot and verify them for the specific hardware revision and software version.
Check fasteners and shelf, free screen travel, and cable protection against pinching and tension. Power and grounding follow the manual and project; electrical work is performed by a qualified specialist.
Agree roles and unique credentials, permitted network connections, and disable unnecessary ports and services. Verify access to settings and content management.
Record the image version and support period. Verify update authenticity, rollback, recovery after power loss and event logging in the agreed configuration.
Before enabling the camera, define required data, processing location, access and retention. Agree visitor information and analytics constraints with the customer.
These are project requirements, not a certification claim or a statement that every firmware includes all functions.
Cybersecurity requirements reference: NISTIR 8259A ↗
Complete the short form. A request number confirms it has been saved.